OAKHILL ENGINEERING, LLC
Structural Consulting Engineers

David Moore Low Water Crossing Bridge
NavUp
NavLeft NavRight

Project Description

This project is to replace the existing culvert structure with a five span bridge. The new bridge consists of one 30 feet crown span in the middle and two 10 ft x 5 ft precast boxes on each side.  The roadway will be widened to include sidewalks on each side. The construction is scheduled to be done in 2014.

[Company] [Services] [Projects] [Principals] [Contacts]

Please contact our Webmaster with questions or comments.
© Copyright 2012 OakHill Engineering, LLC. All rights reserved.